Southeast Surface Water Treatment Facility

Project Overview The City of Fresno Project Details As a sub-consultant to Carollo Engineers, Yamabe & Horn provided on-going development and design of the offsite improvements to Floradora Avenue, Armstrong Avenue, and Olive Avenue required for the construction of the City’s proposed SESWTF. Specifically, Yamabe & Horn delivered plan & profile design in Olive Avenue, […]

Project Overview

The City of Fresno

Project Details

As a sub-consultant to Carollo Engineers, Yamabe & Horn provided on-going development and design of the offsite improvements to Floradora Avenue, Armstrong Avenue, and Olive Avenue required for the construction of the City’s proposed SESWTF.

Specifically, Yamabe & Horn delivered plan & profile design in Olive Avenue, which includes 48-inch and 66-inch pipeline for the Regional Transmission Main (RTM) system for delivery of the treated water to the City’s distribution system. Yamabe & Horn also delivered plan & profile design in Armstrong Avenue, which includes a 1,200-foot portion of the 72-inch raw water pipeline. The project has involved significant coordination with the City and other engineering firms to maintain the critical timelines.

Exp - KRP 01

Southeast Surface Water Treatment Facility

Location:
Armstrong & Olive Avenues
Completion Date:
2015
Project Size:
4,100 Feet of 72”, 66”, and 48” Diameter Steel Pipeline
Project Team:
Adam Lee, PE
Chris Kliewer, PE